- Tower 1: finished parapet and top roof (second time) on 25 Mar 2019
- Tower 2: finished top roof (second time) on 25 Mar 2019, top roof (thirt time) and parapet on 30 Mar 2019
- Tower 3: will finish the 48th floor and 49th floor in the early of Apr 2019 as estimation
- Podium: the Swimming Pool Structure and Landscape (Planters, Bridge, Parapets) were all completed on 22 Oct 2018
Source: http://sunwahpearl.com/tin-tuc/thang-32019-cap-nhat-tien-do-du-an-sunwah-pearl-2.html