- Developer
- Thien An Investment JSC & Tuan Quynh JSC
- Status
- Now selling
- Location
- Tan Tien Ward, Bac Ninh
- Address
- Truong Chinh Street, Tan Tien Ward (former Bac Giang), Bac Ninh
- Total area
- About 10,514 m² site
- Towers
- 1
- Units
- 154
- Handover
- Topped out Aug 2025; finishing works
- Ownership
- Long-term for Vietnamese buyers
Updated
Amenities
Thien An Central is an apartment project on Truong Chinh Street in Tan Tien Ward, in the former Bac Giang city that is now part of Bac Ninh province. It is developed by Thien An Investment JSC in partnership with Tuan Quynh Construction and Trading Services JSC.
The scheme has one mixed-use tower of 18–19 storeys over a basement with 154 apartments, mostly two and three bedrooms from about 52 to 86.5 m², plus a row of five-storey shophouses. The tower was topped out on 10 August 2025, and apartments are sold with built-in furniture.
Working at the Bac Giang industrial parks and need a central apartment? Contact us.
Thien An Central at a glance
| Developer | Thien An Investment JSC and Tuan Quynh Construction and Trading Services JSC |
| Location | Lot HH8, sub-zone 2, Truong Chinh Street, Tan Tien Ward (former Bac Giang), Bac Ninh |
| Tower | 18–19 storeys + 1 basement |
| Apartments | 154; 2-bed about 52–66 m², 3-bed about 82–86.5 m² |
| Shophouses | 16 five-storey units |
| Milestone | Topped out 10 August 2025 |
| Price guide | Around VND 35 million/m² (2025) |
| Handover standard | Built-in furniture |
Location
The site is near Bac Giang’s six-way junction, with Vincom, GO! and AEON Mall Bac Giang within a short drive. The Hanoi–Bac Giang expressway connects to Hanoi in about an hour, and the Quang Chau, Song Khe–Noi Hoang, Dinh Tram and Van Trung industrial parks are 10–20 minutes away.

Who it suits
Engineers and managers from the Bac Giang industrial parks, including foreign specialists, and local families who want a modern flat in the town centre. Supply of new apartments in Bac Giang is still limited, which helps rental demand.
Facilities
Plans include an indoor pool, a gym, a children’s play area, a community room, landscaped grounds and outdoor parking, with retail at podium level.
Buying checks
- Confirm the handover schedule after the 2025 topping-out.
- Check whether the off-plan sales notice covers your unit.
- Ask exactly which furniture and appliances are included.
- Foreign buyers should check the foreign ownership quota.
Sources
Information comes from Bao Dau tu, the project profile on Cafeland, Thu vien Phap luat and 2026 listings on Batdongsan.com.vn, checked on 2 November 2026. Prices and dates may change.
Frequently asked questions
Where is Thien An Central?
On Truong Chinh Street, Tan Tien Ward (former Bac Giang city), Bac Ninh province.
How many apartments does it have?
154 apartments in one tower, plus 16 shophouses.
What sizes are available?
Mainly two-bedroom units of about 52–66 m² and three-bedroom units of about 82–86.5 m².
Has construction finished?
The tower was topped out on 10 August 2025 and moved into finishing works.
Photographs are real, freely licensed images of Bac Giang from Wikimedia Commons and do not show the project or a specific apartment.